Search This Blog

Monday, November 16, 2009

Update #1 (Recap week of Nov 2)




Update#1

For this week, we ordered the spring off of McMaster and purchased the Outer Arm, Inner Block, and Outer Block for Speedy Metals (See above Bill of Materials). We are holding off cutting the spring until we complete the rest of the machining because we spent our own money and don't want to replace it if we make a modification to another part that will effect the required length of the spring. We have completed the CAD model for the MCM (arm module) and continue to think about modifying the CAD drawing for the rest of the components. We will work on the CAD models for the car and the mounting modules in the weeks to come.

Picture of Spring



Picture of MCM (arm module) Drawing



Picture of Outer Arm Drawing



Picture of Inner Arm Drawing



Picture of Outer Block Drawing



Picture of Inner Block CAD/Drawing

No comments:

Post a Comment